An Underground Apartment Development (UAD) is an underground electric distribution system where each secondary service lateral supplies more than one electric meter (ganged meters). In addition to traditional Multi-family Apartment homes, Townhomes are also considered a UAD project. Use the UAD Check List and related links below as your submittal package guide.
Documents, Procedures and Checklist for Underground Apartment Development
- Check List UAD
- Letter of Intent/Rules of Engagement
- Lighting Procedure
- Electric Development Standardization of Files and Drawings
- Apartment Master Site Plan
- JEA Seed (CAD files) for Engineers - When submitting designs, please download the appropriate seed file for the appropriate configurations:
Project Submittal
Once you have gathered all the items from the project check list, submit the collective package to our Electric Development Inbox at elecdev@jea.com for evaluation. Please allow 3 to 5 business days for review and response. Once any corrections are addressed, the project submittal is accepted and assigned to a Project Engineer for electric design. You'll receive a confirmation email introducing the Project Engineer who will be your lead point of contact through electric construction completion.
Development Responsibilities
Developer will provide:
- An acceptable submittal package (above)
- All conduit, transformer pads and secondary pull-boxes
- Installation of the conduit system
- Reimbursement for upgraded lighting
- Street light bases and installation for upgraded lighting
- Reimbursement for JEA beautification work
- Required easements
- 12 month conduit system warranty from system acceptance date
JEA will provide:
- Electric System design
- Manholes and pits
- Standard Lights
- Overhead line removal within the development boundaries
- Overhead relocation for entrance way
- Primary cable and transformers
We look forward to working with you. At JEA, it’s our mission to energize our community through high-value energy and water solutions. We want to be your premier service provider, valued asset and vital partner in advancing our community.
Questions? Email elecdev@jea.com.
Find out more information about our Electric Development process.
Supply Chain Resource Hub
JEA is taking a proactive approach to meet ongoing supply chain challenges and taking steps to meet local development needs.
Related Links
-
Electric Development
At JEA, we work hard to be easy to do business with. When it comes to electric development, we like to start things off with a short, face-to-face meeting to discuss your project needs and answer all your project questions. The best time to have this meeting is when your development plans are 90 percent complete.
-
Underground Residential Development
Documents and checklists needed for underground service in a residential development.
-
Underground Commercial Development
These are the documents and checklist needed for underground service in a commercial development.