Lincoln Villa (Phase 2) Septic Tank Phase Out Project

Estimated Dates & Work Schedule

Anticipated Start Date: 2013-05-30
Anticipated End Date: 2014-08-30
This project has been completed. Below is the information that was provided to customers prior to the project start date. 

Roads Affected

Dekle Avenue, Longspur Avenue, McLeod Avenue, Moncrief-Dinsmore Avenue, New Kings Road, Redpoll Avenue, Smart Avenue

Project Objective

Working in partnership with the City of Jacksonville, JEA will be installing new water and sanitary sewer lines in your neighborhood. This work will also include the addition of 10 fire hydrants to improve fire protection. 120 properties in your area will be eligible for connection to the system once the project is completed. Funding for this project was made available through several State and Federal grants awarded to the City of Jacksonville that are designed to improve the health of the St. Johns River lower basin through elimination of failing septic tanks. JEA will manage the construction of the project and operate and maintain the water and sewer systems once they are completed. Residents and businesses will be eligible for grants that will pay for all the associated connection costs on private property provided the customer meets and agrees to the minimum requirements.

Construction Conditions

Construction will primarily occur in the City rights of way and easements. Roads will have limited access while the water and sewer infrastructure is installed. Sections of driveways may be required to be removed and replaced. The contractor will attempt to have all driveways accessible during evening hours and weekends. In some cases this will not be possible due to the nature of the construction and equipment. Residents will be notified in advance by the contractor to allow for removal of vehicles prior to any work that may block a driveway. If you require special assistance during this time, please call JEA Project Outreach (665-7500) so that arrangements can be made for you.

Restoration of the Project Area:

Restoration of the project area will begin after the new water and sewer mains have been installed, tested and cleared for use. Upon completion of the project, any existing pavement, grass, driveways or sidewalks affected during construction will be returned to its pre-construction condition.