San Jose Boulevard (SR-13) Water Improvement Project

Estimated Dates & Work Schedule

Anticipated Start Date: 2025-02-10
Anticipated End Date: 2025-05-31
*Dates are highly subject to change. Extended (24-7) or weekend work hours will be required to expedite the project and minimize impact to the public.

    Project Objective

    JEA has contracted JB Coxwell Contracting, Inc. to replace the existing 24-inch water main along San Jose Boulevard, between Old River Road and Claire Lane. This project follows an emergency repair completed in the summer of 2024, which addressed a break in the water main.

    After further evaluation, JEA has determined that a full replacement of the pipe is required to maintain the reliability of the water system and to prevent future outages and traffic disruptions. Following the installation of the new pipe, JEA will grout fill the old line to prevent any future voids under the pavement.

    Construction Areas

    Work will primarily occur in City of Jacksonville rights-of-way and easements. 

    Construction Conditions

    To ensure the safety of both workers and the public, one traffic lane in each direction on San Jose Boulevard may be closed nightly between I-295 and Ricky Road during construction (see times below). The median and turn lanes within the work zone will be closed for the duration of the project. The contractor will also work during the day behind the installed barrier wall. 

    Drivers are encouraged to plan for potential delays and consider alternate routes, such as I-295, when possible. Speed limits in the area will be reduced to 35 mph. Please refer to the map below for details on the work zone and detour routes.

    LANE CLOSURE HOURS (NIGHTLY AS REQUIRED)
    8:30 p.m. to 6:30 a.m. (1 northbound lane closed)*
    9:00 p.m. to 8:00 a.m. (1 southbound lane closed)*

    *Times are highly subject to change. Extended (24-7) or weekend work hours may be required to expedite the project and minimize impact to the public.

    Project Area Map

    San Jose Boulevard (Claire to Old River) Project Map

    Planned Water Outages

    Should any planned water outages be necessary during this project, impacted customers will be notified 48-hours in advance. 

    Restoration of the Project Area

    Restoration of the project area will begin soon after the project has been completed. Any existing grass, sprinklers, pavement, curb, gutter, driveways and/or sidewalks affected during construction will be returned to its pre-construction condition.