Estimated Dates & Work Schedule
Anticipated End Date: 2025-05-31
Project Objective
JEA has contracted JB Coxwell Contracting, Inc. to replace the existing 24-inch water main along San Jose Boulevard, between Old River Road and Claire Lane. This project follows an emergency repair completed in the summer of 2024, which addressed a break in the water main.
After further evaluation, JEA has determined that a full replacement of the pipe is required to maintain the reliability of the water system and to prevent future outages and traffic disruptions. Following the installation of the new pipe, JEA will grout fill the old line to prevent any future voids under the pavement.
Construction Areas
Work will primarily occur in City of Jacksonville rights-of-way and easements.
Construction Conditions
To ensure the safety of both workers and the public, one traffic lane in each direction on San Jose Boulevard may be closed nightly between I-295 and Ricky Road during construction (see times below). The median and turn lanes within the work zone will be closed for the duration of the project. The contractor will also work during the day behind the installed barrier wall.
Drivers are encouraged to plan for potential delays and consider alternate routes, such as I-295, when possible. Speed limits in the area will be reduced to 35 mph. Please refer to the map below for details on the work zone and detour routes.
LANE CLOSURE HOURS (NIGHTLY AS REQUIRED):
8:30 p.m. to 6:30 a.m. (1 northbound lane closed)*
9:00 p.m. to 8:00 a.m. (1 southbound lane closed)*
*Times are highly subject to change. Extended (24-7) or weekend work hours may be required to expedite the project and minimize impact to the public.
Project Area Map
Planned Water Outages
Should any planned water outages be necessary during this project, impacted customers will be notified 48-hours in advance.
Restoration of the Project Area
Restoration of the project area will begin soon after the project has been completed. Any existing grass, sprinklers, pavement, curb, gutter, driveways and/or sidewalks affected during construction will be returned to its pre-construction condition.
Contact
-
If you have any questions about the San Jose Boulevard (SR-13) Water Improvement Project, please contact JEA Project Outreach at (904) 665-7500 or email us at projectoutreach@jea.com.