Estimated Dates & Work Schedule

Anticipated Start Date: 2021-05-24
Anticipated End Date: 2021-06-04

Monday through Friday, 7:00 .am. to 5:00 p.m.*

*Note: In some circumstances, extended hours and weekends may be required. 

Project Objective

A contractor working for JEA (IPR) replaced a portion of sanitary sewer main line on Chelsea Street between Price Street and Dora Street and between Dora Street and Jackson Street. Failures to sewer mains can potentially cause major sewer back-ups, environmental harm and roadway issues. Once completed, this project will increase the reliability of the sewer system and help prevent future sewer main breaks. 

This sewer installation was completed using the pipebursting method of construction. This method is less disruptive to neighborhoods than the traditional open-cut method of replacing sewer lines, and the overall project duration is typically shorter. Watch a video at https://www.youtube.com/watch?v=W5JRzpwSbUs.

Construction Conditions

Please see the work area map below.  

Chelsea Street Sewer Repair Project

Restoration of the Project Area

Restoration of the project area typically takes place 2-3 weeks after the sewer line has been repaired, tested and cleared for use. Upon completion of the project, any existing pavement, grass, curb, gutter, driveways or sidewalks affected during construction will be returned to its pre-construction condition.