Islesbrook Parkway Emergency Sewer Repair Project

Estimated Dates & Work Schedule

Anticipated Start Date: 2020-09-16
Anticipated End Date: 2020-09-25

Normal work hours are Monday through Friday, 7:00 a.m. to 5:00 p.m. However, due to the emergency nature of this project, evening hours and weekends may be required. 

Project Objective

JEA replaced a failing sanitary sewer manhole at 580 Islesbrook Parkway near Longleaf Pine Parkway. This manhole was replaced to ensure the reliability of the sewer system that serves the area. Failures to sewer manholes can potentially cause major sewer back-ups, harm to the environment and roadway issues.  

Construction Conditions

Construction occurred in City of Jacksonville rights-of-way and easements. For the safety of our crews and the general public, JEA was required to close and detour Islesbrook Parkway at the work location (please see work area map below). 

Project Area Map

Islesbrook Emergency MH

Restoration of the Project Area

Restoration of the project area will begin in the 2-3 weeks following the manhole repair.  Any existing pavement, grass, curb, gutter, driveways, or sidewalks affected during construction will be returned to their pre-construction condition.