San Jose Boulevard Emergency Sewer Repair Project

Estimated Dates & Work Schedule

Anticipated Start Date: 2023-05-15
Anticipated End Date: 2023-06-15

Monday through Friday, 7:00 a.m. to 5:00 p.m.*

*In some circumstances, extended hours and weekends may be required. 

Project Objective

JEA crews made emergency repairs to a sanitary sewer line located in the utility easement behind 11570 San Jose Boulevard. This repair was necessary to ensure the reliability of the sewer system that serves your neighborhood. Failures to sewer lines can potentially cause major sewer back-ups, environmental harm and roadway issues. 

Construction Conditions

Construction primarily occurred along the existing utility easement located behind 11570 San Jose Boulevard. 

Project Area Map

San Jose Blvd Sewer Repair Project Map 5.11.23

Restoration of the Project Area

Restoration of the project area typically begins within 2-3 weeks after the lines have been installed, tested and cleared for use. Any existing pavement, grass, curb, gutter, driveways, or sidewalks affected during construction will be returned to their pre-construction condition.