Saratoga Drive Sewer Improvement Project

Estimated Dates & Work Schedule

Anticipated Start Date: 2014-04-15
Anticipated End Date: 2014-05-30
This project has been completed. Below is the information that was provided to customers prior to the project start date. 

Roads Affected

Saratoga Drive, Sunnyside Drive

Project Objective

JEA crews will be replacing a 220 foot section of failing sanitary sewer main on Saratoga Drive from the intersection of Saratoga Drive and Sunnyside Drive to 912 Saratoga Drive. This work will require the removal of ground water with a pump system prior to any pipe installation.

Road Closure Information

To complete this work, JEA will be required to close a portion of Saratoga Drive. Residents that reside within the project boundaries will be provided access and are permitted to drive (with caution) within the construction area. There will be limited access to the areas around the immediate construction area. 

Please observe all construction signs, detours, and general directions provided by the JEA crews working onsite. We apologize in advance for delays caused by this work.

Restoration of Project Area

Restoration of the project area will begin after the sewer main has been installed and the dewatering system removed. Upon completion of the project, any existing pavement, grass, curb, gutter, driveways or sidewalks affected during construction will be returned to its pre-construction condition.