- Home
- In Our Community
- Construction Projects
- Silkwood Drive Emergency Repair Project
Silkwood Drive Emergency Repair Project
![](https://www.jea.com/uploadedimages/Images/ConstructionProjectDefaultBanner.jpg)
Estimated Dates & Work Schedule
Anticipated End Date: 2017-09-30
This project has been completed. Below is the information provided to customers prior to the project start date.
Project Objective
JEA crews will be replacing a portion of failing sanitary sewer service on Silkwood Drive between Hartley Road and Cypresswood Drive South. For the safety of our crew, this work will require the removal of ground water with a pump system prior to construction.
Work Schedule
Crews will be working Monday through Friday from 7 a.m. to 5 p.m. and in some circumstances weekend and extended hours will be necessary. Pump systems used to remove ground water will operate continuously during the repairs.
Conditions During Construction
Construction will occur in the City’s street, rights of way and easements. For the safety of our crews and the general public we will be required to temporarily close a portion of Silkwood Drive.
Residents will be permitted to drive with caution through the construction area. Please observe all construction signs, detours, and general directions provided by the JEA crews working onsite. We apologize in advance for delays caused by this work.
Restoration of Project Area
Restoration of the project area will begin after the sewer main has been installed, tested and cleared for use. Upon completion of the project, any existing pavement, grass, curb, gutter, driveways or sidewalks affected during construction will be returned to its pre-construction condition.
Even Better Power Reliability
JEA's state-of-the-art technology identifies customers and neighborhoods in need of electric reliability improvements.
Contact
-
If you have any questions about the Silkwood Drive Emergency Repair Project, please contact JEA Project Outreach at (904) 665-7500 or email us at projectoutreach@jea.com.