West 24th Street Well Rehabilitation Project (Phase 2)

Estimated Dates & Work Schedule

Anticipated Start Date: 2017-07-10
Anticipated End Date: 2018-06-30

Monday - Friday from 7 a.m. to 7 p.m.

Project Objective

JEA has completed rehabilitation of the potable water well located at 1995 West 24th Street. This well is one (1) of over 122 active wells that are part of JEA’s regional water supply transmission system. This well will improve our systems overall water pressure, reliability and continue to provide a robust water supply system throughout JEA’s service territory. 

The first (completed) phase of this project involved the actual cleaning and testing of the existing well. The second phase of work included  the removal of the existing building, installation of new well pumps and a concrete pad, replacement of the above ground equipment and connection to the pipe in the street. Once the work was completed, the well site was fenced for security. 

Conditions During Construction

This work did not affect JEA water or sewer service. Construction activities took place on JEA’s property, and within the City of Jacksonville rights of way, easements and roads. This work required the use of very large equipment, trucks and generators to make upgrades to the well. 

Flushing and Testing of the Well 

JEA was required to flush water from the well on multiple occasions using above ground piping and nearby drainage ditches or structures. This was required for clearing and testing of the well for public use. The flushing and testing process can take anywhere from 1 - 2 weeks.